Scope of works performed
Lifting of the hangar roof with a weight of 2.400 tLifting distance 23 m
Equipment
4 SLU-220/5508 SLU-330/550
Owner
EuroAirport Basel-Mulhouse-FreiburgMain Contractor
Losinger Construction AGVSL Entity
VSl (Switzerland) Ltd.Heavy Lifting Department
Date
2008Project Description
VSL`s sister company Losinger constructed a new hangar in record time at Euro AirportBasel-Mulhouse-Freiburg.Construction started at the end of 2007 and the first plane rolled into the hangar just a fwe months later on 20th of April 2008.
VSL Heavy Lifting was involved throughout the whole project, from the very early design stages. one of the central questions of the project was how to design a roof that could be easily lifted.