Scope of works performed
Design and methods of the heavy lifting solutionDesign of foundations for auxiliary towers and lateral guys
Design, supply and supervision of the installation of the auyiliary towers and cross beam
Technical assistance during liftings
Owner
Shell and PlusPetrolEngineer
PlusPetrolCivil Works Contractor
Graña y MonteroErection Works Contractor
Consorcio Sade-Skanska, Lantintecna and JJCHeavy Lifting
VSL (Switzerland) Ltd.Departement Heavy Lifting
Date
2003Project Description
Camisea Gas Project is the largest gas project in South America and situated in the Peruvian rain forest, north east of Lima. VSL Heavy Lifting was contracted to lift two deethanizer towers, 49 m high and weighing 175 t each.For this lifting we used towers stored in nothern Chile`s desert. These had to be transported on the road across the Andes and then on a river boat to the remote job site in the amazonian rain forest. The other equipment was sent from VSL Switzerland. On the construction site the technicians and engineers from VSL Switzerland and VSL Chile worked hand in hand. The design of the lifting and the foundations for the lifting towers had been prepared by VSL Argentina, TCEU, VSL Switzerland and CTT-Stronghold.
Coordinating all these different partners in the project and the different sources of information was a challenge, which VSL manage perfectly to the satisfaction of its client. Both liftings were completed just before summer 2003.
As a result of the sucessful project, VSL was awarded with two more liftings on another plant of the same project located in Pisco, close to the Pacific Ocean.
More Information?