Scope of works performed
Lifting and launching of the four main roof trusses weighing between 1,290 t and 1,800 t each.Equipment
16 hydraulic jacks SLU3304 hydraulic jacks SLU 70
Main Contractor
Hip Hing - Ngo Kee JVVSL Entity
VSL Hong KongVSL (Switzerland) Ltd.
Heavy Lifting Department
Date
2008Project Description
2008 VSL Heavy Lifting performed the complex and challenging lifting and launching operation of the four main roof trusses for a bridging link needed as part of the expansion of the Hong Kong Convention and Exhibition Centre in Wanchai. The main roof trusses A, B, C and D weigh between 1,290 t and 1,800 t each and span approximately 90 m across the harbour channel, spaced 27 m from one another. They are supported on bearings on top of permanent columns 41 m and 57 m above ground.The existing Atrium Link Bridge between Phase I and II had to remain fully operational while these main trusses had been installed.
Due to this requirement, the first two trusses, A and B, could only be assembled and lifted at the position of truss C and D respectively, and needed to be launched sideways by 54 m over the existing link bridge. The Roof trusses A and B had been lifted in pairs along with the sledges, north/south sliding beams and its supports.
More Information?
Download complete jobreport as PDF(0.23 Mb)