Torun Bridge - Poland
Lifting of deck segments Alignment of the deck segments Fixation of deck segments to hanger cables
 

Scope of work performed

Lifting of deck segments
Alignment
Fixing of deck segments on hanger cables

Main contractor

STRABAG AG

VSL Entity

VSL Heavy Lifting
VSL Poland

Date

2013

Project Description

In the ancient city of Torun in northern Poland a new calbe-stayed bridge spanning 530m over the Vistula River is being built. Between May and August 2013 VSL Heavy Lifting moved 16 deck segments, each weighing 250t, from a pontoon onto the temporary hanger cables. Depending on the water level the lifting distance was about 15m. In a second operation the deck segments were precisely aligned and permanent fixed to the hanger cables.